Bonney Lake: plateau lots, steep edges, and a lot of walls
Bonney Lake sits on a plateau above the White River and Puyallup valleys, with Lake Tapps on its north side. Most neighborhoods are on rolling ground, but the edges of the plateau drop off steeply, and many newer subdivisions were graded into terraces. That makes retaining walls a bigger part of the work here than in flatter towns.
The crews who build Bonney Lake walls are ND employees, backed by 19 years in the trade, more than 425 projects, and a 4.7 Google rating. They work out of our Yelm office and cover the plateau as part of our regular Pierce County route.
What the soil under Bonney Lake does in winter
On a grid of points across Bonney Lake in USDA soil survey data, the most common soil was Alderwood gravelly sandy loam on 8 to 15 and 15 to 30 percent slopes. USDA's description of the Alderwood series puts a dense layer of glacial till 50 to 100 centimeters down, roughly 20 to 40 inches, with a perched water table 30 to 90 centimeters below the surface between December and April. Rain soaks into the upper soil, stops at the till, and moves sideways downhill.
On a sloped or terraced lot, that sideways water ends up behind retaining walls and under the low side of patios. It is the main reason walls bulge and patios sink along the downhill edge. Every wall we build here gets drain rock and a pipe behind it, routed to a legal outlet.
The survey also maps Everett very gravelly sandy loam on some slopes, which drains fast, and Kapowsin gravelly ashy loam, which has a cemented layer 20 to 40 inches down and a perched water table that can rise to 11 to 24 inches below the surface from December through June. The steep escarpments down to the valley are mapped on 45 to 70 percent slopes. Building near those edges takes more care and, often, an engineer.
Bonney Lake's retaining wall rules
Bonney Lake's Retaining Wall Submittal Checklist sets a clear line. If a project proposes walls taller than 4 feet, or walls supporting any adjacent surcharge load such as terraced walls, buildings, roadways, or driveways, the city requires a Structural Retaining Wall Design Report from a Professional Civil Engineer licensed in Washington.
That report must include stamped wall plans, stamped structural calculations, and a geotechnical report stamped by a licensed geotechnical engineer. Note that terraced walls are named as a surcharge. Two 3-foot walls stacked close together on a hillside can land in the engineered category even though neither is over 4 feet.
For homeowners, the takeaway is to plan the wall layout early. Spacing tiers apart, pulling a driveway back from the top of a wall, or reshaping the grade can sometimes keep a project in a simpler path. When the site needs an engineered wall, we plan for the engineer and permit time from the start.
- Walls over 4 feet: engineered design report required.
- Walls under a driveway, building, or road: engineered, regardless of height.
- Terraced walls: the city lists them as a surcharge case.
- Every wall: drain rock and an outlet, because the till sends water to it.
Planning a terraced yard: a checklist before the first block
Most Bonney Lake wall problems start in the planning, not the building. Settle these points before design is final.
- Measure total grade change from the low point to the high point, not wall by wall.
- Decide where the driveway, parking, sheds, and hot tubs go, and keep them back from the top of walls.
- Set the spacing between tiers early; close tiers load each other and can push the design into the engineered category.
- Find the outlet for wall drains and patio runoff before choosing wall locations.
- Confirm whether the lot is inside Bonney Lake or in unincorporated Pierce County, since the rules differ.
Rain and stormwater thresholds on the plateau
NOAA's 1991-2020 normals show 48.31 inches of precipitation a year at the Buckley station to the east and 45.13 inches at McMillin Reservoir to the southwest, with about 16 inches December through February at both. Both also record a few inches of snow in a normal year: 4.3 at Buckley and 5.6 at McMillin. On Alderwood till that water stays near the surface for months, so we plan base drainage for a wet winter.
Large lots make the state's stormwater thresholds easier to hit. Ecology's manual for western Washington counts new and replaced hard surface together: at 2,000 square feet of it, or 7,000 square feet of disturbed ground, minimum requirements 1 through 5 apply. A long driveway replacement plus a backyard patio on a large Bonney Lake lot can reach that. We total the areas early and confirm the city's current rules for the address.
Which project fits a Bonney Lake home?
Typical requests on the plateau and around Lake Tapps:
- Terraced backyards in newer subdivisions: retaining walls planned as a system, with spacing and drainage set before any block goes in.
- Sloped driveways with cracked concrete: a paver driveway with a solid edge and water routed off the surface, kept clear of wall surcharge zones.
- Lake Tapps homes: patios and walkways toward the water, with shoreline and critical area rules checked first.
- Settled patios on the downhill edge: repair and re-leveling, plus a drain fix so it does not happen again.
- Fire pits and outdoor kitchens on flat plateau lots: straightforward builds on a drained base.
How a Bonney Lake project runs
Bonney Lake visits run longer than most, because we measure the whole grade change, not just the patio footprint, and we look for anything that would add surcharge above a wall. The free 3D design shows wall tiers, setbacks, and patio levels together. The free quote separates wall work, base and paving, drainage, and engineering or permit costs, so you can see which choices change the price. The same ND crew builds the walls and the paving.
Sources
- City of Bonney Lake: Retaining Wall Submittal Checklist
- WA Dept. of Ecology 2024 SWMMWW, I-3.3 Applicability of the Minimum Requirements
- USDA NRCS Soil Data Access (Web Soil Survey data), map unit queries across Bonney Lake, 2026-10-13
- USDA Official Soil Series Description: Alderwood
- USDA Official Soil Series Description: Kapowsin
- USDA Official Soil Series Description: Everett
- NOAA NCEI 1991-2020 Climate Normals, Buckley 1 NE (USC00450945)
- NOAA NCEI 1991-2020 Climate Normals, McMillin Reservoir (USC00455224)